CAPA Action Management
The CAPA Action Management page provides a dedicated view for tracking and completing all corrective and preventive actions. This page covers how to update action statuses, provide evidence, use bulk assignment, and start the effectiveness review.
Open the action management page
Section titled “Open the action management page”- On the left sidebar, select CAPA.
- Expand a CAPA row in the list.
- Select an action to open the action tracking page.
The page displays the CAPA header, overview, and all actions organized by type (corrective and preventive).
Review the CAPA overview
Section titled “Review the CAPA overview”At the top of the page, the overview card shows:
- Root Cause Analysis — summary of the identified root cause.
- Effectiveness Review — the defined effectiveness criteria and due date.
- CAPA Status — current status badge with deviation link.
Update an action status
Section titled “Update an action status”- On the action card, select a new status from the status dropdown.
- Available transitions: Pending to In Progress, In Progress to Completed.
Mark an action as completed
Section titled “Mark an action as completed”When changing status to Completed, a completion form appears:
- Select Completed from the status dropdown.
- In the Evidence of Completion form that expands, enter a description of what was done.
- Select Mark Complete.
Re-authenticate for electronic signatures
Section titled “Re-authenticate for electronic signatures”If a signature already exists for the action, the system prompts for re-authentication:
- Click Get Verification Code to receive a 6-digit code via email.
- Enter the verification code in the field provided.
- Select Re-sign to confirm the completion.
This protects the integrity of the electronic signature process in compliance with 21 CFR Part 11.
Use bulk assignment
Section titled “Use bulk assignment”Bulk assignment lets you reassign multiple actions to a single user at once.
- Select Bulk Assign (available from the CAPA list expanded view).
- In the Bulk Assignment modal, search for and select the assignee.
- Check the boxes next to the actions you want to reassign. Each action shows its current assignee and status.
- Select Assign Actions.
Review progress
Section titled “Review progress”The Progress Summary card at the bottom of the page shows:
| Metric | Description |
|---|---|
| Pending | Number of actions not yet started. |
| In Progress | Number of actions currently being worked on. |
| Completed | Number of finished actions. |
| Total | Total number of corrective and preventive actions combined. |
Start the effectiveness review
Section titled “Start the effectiveness review”When all corrective and preventive actions are completed:
- In the page header, select Start Effectiveness Review.
- This navigates you to the Effectiveness Review page.
Action fields
Section titled “Action fields”Each action card displays:
| Field | Description |
|---|---|
| Action Number | Sequential number within the action list. |
| Status Badge | Current status with color coding (pending, in-progress, completed). |
| Overdue Badge | Red badge when the due date has passed and the action is not completed. |
| Description | Detailed description of what needs to be done. |
| Responsible Person | The user assigned to complete this action. |
| Due Date | Deadline for completion. |
| Completed Date | Shown when the action has been marked as complete. |
| Completion Evidence | Text describing what was done, displayed in a highlighted section. |
Practical example: tracking actions for a cross-contamination CAPA
Section titled “Practical example: tracking actions for a cross-contamination CAPA”Scenario: A CAPA was created after a cross-contamination deviation where Product A residue was detected on equipment used for Product B. The CAPA has three corrective actions and one preventive action.
Updating action statuses
Section titled “Updating action statuses”- On the left sidebar, select CAPA and expand the cross-contamination CAPA.
- The Progress Summary shows: Pending: 4, In Progress: 0, Completed: 0, Total: 4.
- Select Action #1 (“Perform additional cleaning validation swabs on shared equipment line EQ-14”). Change its status from Pending to In Progress.
Completing an action with evidence
Section titled “Completing an action with evidence”- The cleaning validation is done and swab results are within acceptance criteria. On Action #1, select Completed from the status dropdown.
- In the Evidence of Completion form, enter: “Cleaning validation swabs performed on 2026-03-12. All 12 sampling locations on EQ-14 showed residue levels below 10 ppm acceptance criterion. Swab results documented in CV-RPT-2026-0034. Most challenging location (valve manifold): 3.2 ppm.”
- Select Mark Complete. If prompted, click Get Verification Code, enter the 6-digit code sent to your email, and confirm the electronic signature.
Using bulk assignment
Section titled “Using bulk assignment”The QA specialist originally assigned to Actions #2, #3, and #4 is on leave. Reassign to a colleague:
- From the CAPA expanded view, select Bulk Assign.
- Search for and select “qa.specialist2@company.com”.
- Check the boxes for Actions #2, #3, and #4.
- Select Assign Actions.
Starting the effectiveness review
Section titled “Starting the effectiveness review”- After all four actions show Completed status (Progress Summary: Pending: 0, In Progress: 0, Completed: 4, Total: 4), the Start Effectiveness Review button becomes available.
- Select Start Effectiveness Review to proceed to the final CAPA phase.
Permissions
Section titled “Permissions”| Permission | Description |
|---|---|
capa.update | Update action statuses and provide completion evidence. |
capa.review | Access the effectiveness review once all actions are complete. |